THE FEELING OF WAKING UP
TO THIS VIEW IS IMMEASURABLE.

Horizons 101 is a natural standout in the city skyline.
The tallest structure in Cebu and outside of Metro Manila,
Horizons 101 truly elevates cosmopolitan living
to breathtaking new levels.

HORIZONS 101
IN NUMBERS

Rising 173 meters above sea level, Horizons 101 gets its name from
the combined total floors of Tower 1, with 55 floors, and Tower 2 with 46.

High-speed elevators take 55 seconds to reach the 55th floor.

Key areas within the Towers are supported by 100% back-up power.

AN ENGINEERING MARVEL

Solid from top to bottom, Tower 1’s foundation alone uses 16,000 cubic
meters of concrete—equivalent to 245 NBA basketball courts!

Further strengthening Horizons 101, a staggering 10,000,000 kilograms
of metals are incorporated into its structure. It would take 500 trailer
trucks to carry that much.

As of August 19, 2016, 86 units have achieved ZERO punch list—the
gold standard in quality construction.


Tastefully appointed and thoroughly modern, Horizons 101 is a restful home that’s right within a dynamic neighborhood. A short walk or drive away from a multitude of activities, Horizons 101 promises a lifestyle that is both elevated and exciting.

HORIZONS 101 IN NUMBERS

comfort-by-design-logo

Lever-type Door Handles

Requiring less effort to operate
than doorknobs, these handles
make opening doors easier.

Soft-close Cabinets

The sound of banging cabinet doors
is eliminated with soft-close hinges.

Standard-sized Modern Design
Fiberboard Doors

Made of engineered wood, these
doors are not only durable, but also
more environment-friendly.

No-drip Countertops

Raised edges on sink countertops
prevent spills from reaching the floors.

Elevator Key Card Access System

Building security is enhanced
by a system that limits floor
access to its residents.

Unit Deliverables

Unit

  • 2.925m Floor-to-ceiling Height
  • Melamine Door with Laminated Finish
  • Semi-gloss Painted Walls
  • Homogeneous Tiles
  • Aluminum Framed Glass
  • Provisions for Cable, Phone, Internet, and AC Unit
  • Electrical Panel Box
  • Electrical and Water Submeter
  • Smoke Detectors and Fire Sprinklers

Kitchen

  • 2.4m Floor-to-ceiling Height
  • Modular Base Cabinet
  • Solid Surface Countertop
  • Single Basin Sink
  • Greasetrap
  • Provisions for Refrigerator, Range, and Mechanical Ventilation

Toilet and Bath

  • 2.4m Floor-to-ceiling Height
  • Semi-gloss Latex Painted Walls
  • Melamine Door with Laminated Finish
  • Half Pedestal and Wall Hung Lavatory
  • Tiles at Shower Area
  • Rain Shower
  • Toilet & Bathroom Fixtures
  • Provision for Single Point Water Heater

Bedroom

  • Melamine Door with Laminated Finish
  • Semi-gloss Latex Painted Walls
  • Homogeneous Tiles
  • 2.7m Floor-to-ceiling Height
  • Provision for Window-type AC Unit

h101-map

Team of Experts

Owner/ Developer Taft Property Venture Development Corp
Design Architect NSI Architects
Structural Engineers Sy^2 + Associates Inc.
MEPF and Elevator Meinhardt Philippines /(redesigned under DDT KOnstruct by NBF Consulting Engineers (Plumbing & Sanitary), M.A. Alix & Partners (EE), RJ calpo & Partners (mechanical-tower 1) but for tower 2 it s A.O. Pasia
Mechanical RJ Calpo & Partners
Electrical Mario A. Alix & Partners
Plumbing NBF Consulting Engineers
Fire Protection NBF Consulting Engineers
Sanitary NBF Consulting Engineers
Elevator Meinhardt Philippines Inc.
Interior Design Steven Leach Jr. + Associates
H1 Architecture
Site Engineering RSA & Associates
Landscape Architect ADI Limited Inc.
SGS Designs Landscape Architecture
Quantity Surveyor Langdon & Seah Philippines Inc.
Project Management Design Coordinates Inc.